Step by step :
1. Cover the whole surface with the membrane. Seams must be joined together and must not leave any uncovered surface.
2. Begin along the wall. Fold lengthwise to uncover the subfloor against the wall (figure 3).
3. Spread adhesive on the uncovered part.
4. Unfold over the glued part of the subfloor.
5. Repeat until the whole surface is entirely done.
6. Make sure seams are joined together and glued to the subfloor (figure 4). It is not necessary to seal the seams with an adhesive tape.
7. Roll the installed membrane with a 75 -100 lbs roller to make sure the tranfer of adhesive is done properly (figure 5).
8. Proceed with floor covering installation. |